Filter

Construction, Testing and Successful Commissioning of Slow Sand Filtration Plants 01 No. 2000GPH Cap., 03 Nos. 1000GPH Cap. and Chain Link Fencing Around the Structure at Spots of WSS Punekhar Malwana under JJM (JKSSR 2020)/e-NIT No. 99 OF 09/2023-24/202

Construction of Lane drain at Toph Manhasa ward no.3 ,4 and construction of Kacha Nallah inculding desilting of existing 02 no. at Sum ward no.7 , Panchayat Sum , Block Mandal Phallian under PRI Capex 2023-24./e-NIT No. 506-REWJ of 2023 dated. 11-09

Patch and Pothole repair to road caused due to heavy rain at various places of Ward no-37/BMC-EED-II-11/2023-24 Dt 08.09.23/2023_ORULB_94128_8

Battery operated Eco-Rickshaw (Size- 55X38X31 Inch) with- Exide eride 100 L(4 Pcs Battery) - 6 months warranty, Charger, Heavy iron Body, 43mm front shacker with spring, Rare shacker, 900W motor, 48 V- 900W Heavy controller, 33 inch differential, Hea/13 e

Construction, Testing and Successful Commissioning of Slow Sand Filtration Plants, 02 Nos. 2000GPH Cap. 02 Nos. 500GPH Cap. and Chain Link Fencing Around the Structure at Spot of WSS Khankoot under JJM (JKSSR 2020)/e-NIT No. 99 OF 09/2023-24/2023_PHE_229

Construction, Testing and Successful Commissioning of Slow Sand Filtration Plants 01 No. 2000GPH Cap., 01 No. 1000GPH Cap. and Chain Link Fencing Around the Structure at Spots of WSS Kumhari under JJM (JKSSR 2020)/e-NIT No. 99 OF 09/2023-24/2023_PHE_2293