Filter
Construction, Testing and Successful Commissioning of Slow Sand Filtration Plants, 02 Nos. 2000GPH Cap. 02 Nos. 500GPH Cap. and Chain Link Fencing Around the Structure at Spot of WSS Khankoot under JJM (JKSSR 2020)/e-NIT No. 99 OF 09/2023-24/2023_PHE_229
Battery operated Eco-Rickshaw (Size- 55X38X31 Inch) with- Exide eride 100 L(4 Pcs Battery) - 6 months warranty, Charger, Heavy iron Body, 43mm front shacker with spring, Rare shacker, 900W motor, 48 V- 900W Heavy controller, 33 inch differential, Hea/13 e
(WORK No.-01) Construction of Interlocking Road and Drain From House of Umesh soni to House of Kamlesh Pathak at Narupura Ward, Mahoba/473/NPP MAHOBA/2023-24 Dated_11.09.2023/2023_DOLBU_836925_2
Construction, Testing and Successful Commissioning of Slow Sand Filtration Plants, 02 Nos. 2000GPH Cap. 02 Nos. 500GPH Cap. and Chain Link Fencing Around the Structure at Spot of WSS Khankoot under JJM (JKSSR 2020)/e-NIT No. 99 OF 09/2023-24/2023_PHE_229
Providing of 01 light Vehicle i.e Mahindra Scorpio / Innova Only for official Purpose in the office of Executive Engineer RnB Division Pahalgam (with Driver). (Make 2018 or above) and Bolero Neo/NIT09/EE RNB-Pgm/2023-24/292-299 dt 09/09/2023/2023_PWDJK_22
Construction of Lane drain at Toph Manhasa ward no.3 ,4 and construction of Kacha Nallah inculding desilting of existing 02 no. at Sum ward no.7 , Panchayat Sum , Block Mandal Phallian under PRI Capex 2023-24./e-NIT No. 506-REWJ of 2023 dated. 11-09